Bathroom Project.

Our team Stripped out this bathroom including the airing cupboard. New pipes where run inorder to replace the old bath with a shower cubicle. The ceiling was over boarded and newly plastered ready for the customer to paint. The refit consisted of floor to ceiling tiles. The floor was a basic design with square tiles. The walls where tiled with the metro tiles and the brick effect was used to give a modern finish. The new equipment was then placed and fitted. Leaving a lovely modern bathroom. The radiator and colour scheme give a quirky vintage feel. From Start to finish this bathroom took the team 7 working days.